April
1, 2003 Minutes ~ Annual Meeting
The
April 2003 Skippack Ridge
Community Association Board of Directors
meeting was held at the Skippack Township Building. Attendee's included Bob Arch,
Mike Roynan, Fran
Tendall, Bill Turner, Mike Washington and several community homeowners.
Topics addressed included:
-
Our
Annual Association fee's were reviewed and a proposed increase in
these fee's was discussed. An $8-$10/month increase (per
household) will balance the budget. No fee increase was
presented for the year Jan 2003 - Dec, 2003 therefore a slight deficit
will be incurred. The current Board is recommending that at
least a portion of the $8-$10/month increase (per household) be introduced in the
January 2004 billing cycle.
-
The
Board will review the by-law related to having 2 of the 5 Board
members serve a 2 year term. Amendment to this by-law has not
yet been decided.
An
election for the 2003-2004 Skippack Ridge Board of Directors was
held. The final vote resulted in the following three candidates
being selected as Board Of Directors - ELECT with their term
commencing on 6/18/2003:
-
Please
take the time to congratulate these folks for their achievement
and their willingness to contribute to this cause. By
managing the Association ourselves, voluntarily, we are each
saving a few hundred dollars annually.
-
The
annual "Cleanup our Community"
date has been set for Saturday April 5,
2003 at 10am. Volunteers interested in assisting w/ a Community
clean-up effort are meeting at the Gazebo (at the entrance to Skippack
Ridge). Coffee & Doughnut stations will be set up to provide
refreshments for the volunteers. We could really use a hand in
this effort!
-
Our
annual "Easter Egg
Hunt" has been
scheduled for Saturday
April 12, 2003 ~ 10am-Noon at 825 Mountaintop Dr.
Once again, Barb & Marlene will be our generous hosts.
Please bring the children out to enjoy the Games, Activities, Food, Fun,
& the Hunt !!!
-
If
you would like to participate, place 1 dozen filled eggs with the
name and age of the
children in the box on Barb and Mar's porch
-
If
you would like to help ~ please call Barb at 610.454.9664
-
Rain
Date ~ Sun, April 13th
-
Now
that Spring time is just around the corner, many of you are probably
planning to enhance your grounds w/ structures. Please submit
any requests for sheds, fences, satellite dishes, etc. to the Board@SkippackRidge.com.
We all need to respect one another's property and by receiving
approval on any planned enhancements, you'll avoid potential conflicts
w/ the community at large.
-
The
following Fieldstone-related items will be addressed in early Spring,
2003: In
a follow-up to John Genovese's statement regarding tree
replacement and water retention basin corrections:
Mr. Genovese stated that Fieldstone
Associates will replace the dead trees "if" the township
enforces the request under the existing enforcement bond. It
should be noted that in the June 24, 2002 Board of Directors meeting (click
here for minutes) John Genovese committed to following:
-
Statement
regarding street tree warranty:
-
Skippack
Ridge Community Association has received an 18 month guarantee,
from Fieldstone Associates, on all street trees throughout the
community -- Fieldstone's warranty period (to Skippack Ridge)
begins at the end of the warranty period between Cedar Hill and
Fieldstone
-
Mike
Roynan parlayed the following information: Chris Badali,
Esq. (832 Mountaintop Dr.) contacted a Skippack Township
engineer; the township is aware of the dead trees and the
problematic water retention basin and stated that they
will direct Fieldstone Associates to have these problems
resolved in a timely manner
|